Práce a štúdie - Vydanie 16
Permanent URI for this collectionhttps://drepo.uniza.sk/handle/hdluniza/1147
Browse
Search Results
Item Súčasný stav a rozvoj systému pohybových plôch na letisku M. R. Štefánika(University of Žilina, 2024) Adamík, Jozef; Kazda, AntonínIn view of the dynamic development of air transport, it is essential that airport infrastructure is adapted to the requirements of modern aircraft. The thesis analyses the historical development of the infrastructure of M. R. Štefánik Airport (BTS). This research involves guided interviews and questionnaires with seven experts of practice who provided insight into the current state of the BTS airport. These experts were selected from five different areas, including BTS Airport, Air Navigation Service Provider (LPS), noise and vibration assessment (Euroakustik company), runway systems capacity, and the perspective of the Bratislava Metropolitan institute. The aim of the thesis is to propose appropriate recommendations for BTS Airport, the main proposal being the use of one runway (RWY) in 'mix mode' instead of using both RWYs at the same time. This proposal is supported by the cost of the RWY reconstruction, which has been compared with other airports in Europe and North America. To validate the capacity of a single RWY, the Airfield Capacity Spreadsheet Prototype Model (ACRP 79) will be used, in which several inputs have been adjusted according to BTS airport operations such as: aircraft operating from BTS airport, aircraft separations, aircraft approach speeds, and RWY occupancy time. The model simulates operations in August and December 2023 and projected operations in 2028. Other recommendations include modification of some taxiways (TWY), apron modifications, and analysis of the use of jetways on the apron stands. Finally, the impacts of a possible restriction of airport Curfew at BTS are also being examined.